Skip to main content
/

Site Navigation

Your Account

Choose Language

Help
Editing Step 7 —

Step Type:

Drag to rearrange

Solder up the last group of strips, starting with the strip circled blue and following the arrows.

Some connected strips don't share a hub - you need to run these wires in parallel with strips. Use hot glue to tack these to the side so they don't block any LED's.

Solder wires to the DI and CI pads of the first strip in each of the four diagrams. These are circled in the diagrams. Route the wires out of the bottom node.

At each hub, wire all the VCC pads together, then wire all the GND pads together. DO NOT connect any VCC pad to GND.

Solder wires to the two VCC and two GND pads in the bottom node and route them out the bottom.

Your contributions are licensed under the open source Creative Commons license.